Design Practice: Carr
Category: Hospitality
Photography: Sharyn Cairns

The project incorporates such initiatives as stormwater collection, on-site wastewater treatment and recycling, recycled material selection and energy efficient selection of fixtures, fittings and equipment. Also included are 100 percent on-site treatment of water and sewage, 20,000-litre rainwater tanks, 20,000-litre treated water tank, winter dam storage for irrigation, 20-kilowatt photovoltaic solar panels, solar-heated gas-boosted hot water system, solar-heated gas-boosted external pool/spa and on-site composting of all food waste.